Earthworks and site preparation
We prepare sites for the next construction stages and coordinate machinery to the available work front.
Request a quote→BIMARKS service
Earthworks with plant, operators and delivery control
We carry out excavation, soil movement and disposal, pits and trenches, grading, embankments, soil replacement and base preparation. Operated construction plant is selected for the available work front.
Before starting we clarify ground conditions, existing utilities, design levels, soil balance and access. Layer compaction is organised to the project requirements and the needs of the following construction stage.
What we deliver
- Excavation
- Grading
- Base preparation
- Trenches
- Operated machinery
- Foundation pits and excavation
- Trenches and pipe bedding
- Embankments and site grading
- Soil stabilisation and replacement
- Sorting and removal of demolition material
Real BIMARKS work
Earthworks
Excavation, grading, soil movement, bases and trenches with operated machinery.
1 / 6BIMARKS
How a project starts
- ✓
We receive drawings, quantities and the site address
- ✓
We clarify scope boundaries, materials, equipment and programme
- ✓
We prepare a quotation and delivery plan
Preliminary estimate
Work price calculator
Select work items, enter quantities and choose whether standard materials should be included.
This is an indicative estimate excluding VAT, not a BIMARKS quotation. Final pricing depends on design, thicknesses, material grade, access, mobilisation, logistics, ground, existing utilities, traffic management and programme.
FAQ
Frequently asked questions
Can you supply machinery with operators?+
Yes. Machinery and programme are selected for the site conditions and quantities.
What is needed for an earthworks quotation?+
A site plan or drawings, quantities, ground information, soil movement or disposal requirements, location and programme.
Can you arrange soil disposal?+
Yes, once the material type, estimated quantity, loading conditions and receiving location are confirmed.
How is compaction controlled?+
Fill is placed in layers to the project requirements; required field measurements and laboratory tests are agreed with the client.
Start with the scope
Send drawings or a short work description.
Add the location, quantities, timing and a file. BIMARKS receives the request by email and follows up.